Clouderio
Azure · AWS · Google Cloud · GDPR-compliant
GDPRISO 27001SOC 2

Your infrastructure in the cloud — in 8 weeks, without data loss

Move to the cloud securely — with minimal risk

We migrate your IT infrastructure to Azure, AWS or Google Cloud and then take over ongoing cloud management: optimization, monitoring and cost control from a single provider.

PartnersMicrosoft PartnerGoogle PartnerAWS PartnerIONOS Partner
GDPR-compliant
NIS2-compliant
Servers in Germany
<4h response time
35%
average cost reduction
vs. on-premises after 12 months
8 wks
typical migration time
for infrastructures with 50–200 servers
0
data losses
in more than 40 completed cloud migrations
Anonymized reference caseMid-sized machine builder · Rhine-Main region, 220 employees
+

Starting point

Outdated on-premises server infrastructure, soaring maintenance costs, no disaster protection.

Solution & result

Complete migration to Azure Frankfurt in 6 weeks: 40 VMs, ERP, Active Directory, backup.

38% cost reduction in the first year, 99.97% availability, full GDPR compliance.

The problem

On-premises infrastructure eats up budget and blocks growth

  • A hardware refresh every 3–5 years costs six figures without any direct added value
  • IT outages caused by outdated systems — avg. 17 hours of downtime per year at mid-sized companies
  • No disaster protection: a server room fire means data loss
Our answer

Cloud migration with a fixed price, guaranteed timeline and zero surprises

  • Full cost transparency before the project starts — no scope creep, no overruns
  • Migration during a maintenance window: employees notice no difference on Monday
  • German data centers (Azure Frankfurt) — your data never leaves the EU

Scope of services

What Cloud Migration & Management does for you

Migration Assessment

A complete analysis of your existing infrastructure, applications and dependencies — as the basis for migration planning.

Fixed-price quote within 5 business days

Lift & Shift / Replatforming

Flexible migration strategies: direct cloud migration or targeted modernization of applications.

Migration time: 4–12 weeks

Cloud Automation

Infrastructure as code with Terraform and Bicep — for reproducible, secure cloud environments.

Reproducible & auditable

Cost Optimization

Continuous FinOps: rightsizing, reserved instances and automatic scaling for maximum efficiency.

Avg. 35% cost reduction after 12 months

Cloud Monitoring

Real-time monitoring of all cloud resources with automatic alerts and monthly performance reports.

24/7 alert response <15 min.

Cloud Security

Zero-trust architecture, IAM, encrypted transmission and GDPR-compliant data storage in German data centers.

GDPR-compliant & ISO 27001

Approach

How we work

1

Assessment & Planning

Weeks 1–2

Inventory, risk analysis and creation of the migration roadmap with timeline and cost planning.

2

Pilot Migration

Weeks 3–4

Migration of a non-critical application as a proof of concept — lessons learned for the main migration.

3

Full Migration

Weeks 5–7

Step-by-step migration of all systems with minimal downtime and continuous testing.

4

Hypercare & Operations

From week 8

Intensive support after go-live, followed by the transition to regular managed cloud operations.

“

Clouderio migrated our entire infrastructure to the Azure cloud in 6 weeks — without a single hour of downtime for our production. That was impressively professional.

AM
Andreas M.
Head of IT · Machine building company, Rhine-Main region, 220 employees
FAQ

Frequently asked questions

Everything you need to know about Cloud Migration & Management at a glance.

01How long does a typical cloud migration take?+

For mid-sized infrastructures with 50–200 servers, we plan 6–10 weeks. In the assessment workshop, we determine your specific timeline — binding, not just a guideline.

02Do you have a rollback plan if something goes wrong?+

Yes, always. The old and new systems run in parallel for at least 2 weeks. We never migrate without a complete backup and a defined rollback path. In 40+ migrations, we have never had to use it.

03Can employees keep working during the migration?+

Yes. The switchover takes place in an agreed maintenance window (typically Friday night). On Monday morning, employees log in as usual.

04Will the servers remain in Germany?+

Entirely. Azure Frankfurt and Berlin, AWS eu-central-1. Your data never leaves the EU at any time. All data processing agreements (DPAs) are documented in compliance with the GDPR.

05How much does cloud migration & management cost?+

The migration project at a fixed price: typically €15,000–60,000. Ongoing cloud management from €990/month. Binding quote after a free assessment call.

06Will our specialized software (ERP, CAD) work in the cloud?+

Usually, yes. In the assessment, we check every application for cloud readiness and give a clear recommendation for each one.

Free assessment workshop — no obligation

In 60 minutes, we analyze your current situation and show you exactly which solution makes sense for your business — with a binding quote within 5 business days.

Free assessment workshop
Fixed-price quote within 5 business days
Personal contact based in Bad Homburg
Bad Homburg vor der Höhe · Rhine-Main Region